What to Expect During the Pool Building Process: From Design to Dive-In

  • Writer: Leah Hughes
    Leah Hughes
  • May 5
  • 3 min read

Pool Building

If you're thinking about adding a swimming pool to your backyard in Austin, Texas, knowing what to expect during the pool building process is essential. At Texas Innovative Pools, we guide you every step of the way, from concept to cannonball. In this detailed guide, we'll walk you through the stages of pool construction so you can feel confident about your investment and timeline. 


Understanding the Pool Building Journey 


Building a custom swimming pool is an exciting project that combines design, engineering, and construction. Whether you're choosing a fiberglass pool, gunite pool, or vinyl liner, each project follows a structured process designed to ensure quality, safety, and beauty. 


Step 1: Initial Consultation and Site Evaluation 


Your pool journey begins with a consultation. A Texas Innovative Pools design expert will: 


  • Evaluate your yard’s slope, size, and soil conditions. 

  • Discuss your vision, lifestyle, and budget. 

  • Suggest the ideal pool type and features. 


Pro Tip: If you're in areas like West Lake Hills or Lakeway, soil type and elevation can influence your design. 


Step 2: Pool Design and 3D Rendering 


Next, our design team creates a custom pool layout: 


  • Tailored to your backyard dimensions. 

  • Includes add-ons like tanning ledges, waterfalls, spas, or outdoor kitchens.

  • Visualized using 3D renderings so you can see the final product before construction begins. 



Step 3: Permits and Engineering 


Before breaking ground, we handle:


  • Permits required by the City of Austin and surrounding municipalities. 

  • Engineering reviews to ensure structural integrity. 


This ensures compliance with local codes, particularly important in Travis County and surrounding areas. 



Step 4: Excavation and Ground Prep 


Now the transformation begins. We: 


  • Excavate the pool site using professional-grade equipment. 

  • Install rebar and plumbing depending on the pool type (gunite, vinyl, or fiberglass).


In areas with rocky soil like Dripping Springs, excavation may take slightly longer. 


Step 5: Pool Shell Installation 


Depending on your choice: 


  • Fiberglass pools are pre-molded and installed quickly. 

  • Gunite pools require a custom-formed concrete shell. 

  • Vinyl liner pools involve a steel or polymer frame followed by a vinyl insert. 


Each has its pros and cons, which we help you weigh based on your goals and maintenance preferences. 


Step 6: Plumbing, Electrical & Equipment Setup 


Once the shell is in place: 


  • Filtration systems, heaters, and lighting are installed. 

  • Electrical lines are laid safely and in compliance with Texas state codes. 


We only use top-of-the-line equipment from trusted brands. 


Step 7: Decking and Landscaping 


Your pool isn’t complete without a beautiful finish. We’ll: 


  • Pour and finish concrete, travertine, or paver decking. 

  • Install landscape lighting, pathways, and planting features. 



Step 8: Final Inspection and Filling 


After the city’s final inspection, your pool is filled, chemicals are balanced, and systems are tested. You’ll receive a detailed walkthrough of your pool’s operation and maintenance best practices. 


Timeline: How Long Does It Take to Build a Pool in Austin? 


Most custom pool builds in the Austin area take 6 to 10 weeks, depending on weather, material availability, and complexity. Permitting in areas like Bee Cave or Round Rock may add extra time due to zoning regulations. 


Why Choose Texas Innovative Pools? 


  • 20+ years of experience in pool building and outdoor living. 

  • Serving Austin, Lakeway, Dripping Springs, Cedar Park, and surrounding areas.

  • Fully licensed and insured with a reputation for craftsmanship and client care.